Efficient Spiral Weld Pipe Mill Reduced Labor Continuous Production
The spiral welded pipe unit is a standard finalized unit developed and improved by DORCO Heavy Industries on the basis of absorbing the essence of foreign forming process technologies and combining with the actual domestic situation. It is a mature unit with the most competitiveness and technical characteristics of DORCO Heavy Industries.
▶ The production process of the spiral welded pipe unit:
• Raw Materials: Steel coil, welding wire, and flux. All materials undergo rigorous physical and chemical inspections before use.
• Strip Head-Tail Butt Welding: Single or double-wire submerged arc welding is applied for strip head-tail joining. Automatic submerged arc welding is used for repair welding after coiling into pipes.
• Pre-Forming Treatment: The steel strip undergoes leveling, edge trimming, edge planing, surface cleaning, conveying, and pre-bending.
• Pressure Control: An electric contact pressure gauge controls the pressure of the hydraulic cylinders on both sides of the conveyor to ensure stable strip feeding.
• Weld Gap Control: A weld gap control device ensures precise welding gap requirements, with strict control over pipe diameter, misalignment, and weld gap.
• Strict Inspection: Each batch of pipes undergoes rigorous testing, including mechanical properties of welds, chemical composition, fusion quality, surface inspection, and non-destructive testing. Production begins only after passing all quality checks.
▶ Fully Automatic Hydrostatic Testing Machine
This machine conducts pressure tests on welded pipes, featuring computer-based recording, storage, printing, and result analysis. It supports pipe diameters from Φ20 to Φ3500mm and test pressures from 10 to 110MPa.
▶ Fully Automatic Pipe-End Facing and Chamfering Machine
Designed for pipe-end facing and chamfering, this machine uses profiling chamfering tools to ensure uniform and aesthetically pleasing grooves. It complies with standards such as API-5L, API-5CT, BS1387-85, ASTM, and GB9711, tailored for pipe manufacturers.
▶ Ultrasonic Flaw Detector
• Automatic defect alarm and spray marking, enabling operators to adjust parameters accordingly.
• Sections marked with continuous ultrasonic inspection undergo manual ultrasonic and X-ray re-inspection.
• Defects are repaired and re-inspected via non-destructive testing until fully eliminated.
▶ X-ray Pipe Inspection System
Integrated seamlessly with the production line, this system meets the control and management requirements of pipe manufacturers. Highly automated and user-friendly, it is widely adopted in domestic pipe production lines.
Model | Specification(mm) | Coil weight (ton) | Coil width(mm) | Thickness(mm) | Capacity(KW) | Area(m2) |
DRC-400 | φ219-φ426 | 10 | 400-750 | 5-8 | 150 | 18*72 |
DRC-500 | φ219-φ529 φ219-φ720 | 15 | 400-800 | 5-10 | 180 | 18*72 |
DRC-600 | φ219-φ630 | 15 | 450-1050 | 6-10 | 190 | 21*72 |
DRC-700 | φ219-φ720 | 15 | 500-1250 | 5-12.7 | 210 | 21*72 |
DRC-800 | φ219-φ820 | 20 | 500-1300 | 6-12.7 | 220 | 24*78 |
DRC-1000 | φ219-φ1020 | 20 | 500-1560 | 6-12.7 | 220 | 24*78 |
DRC-1400 | Φ325-φ1420 | 25 | 500-1560 | 6-18 | 400 | 24*120 |
DRC-1600 | Φ426-φ1620 | 30 | 1100-1600 | 6-20 | 400 | 24*120 |
DRC-1800 | φ508-φ1820 | 30 | 1200-1600 | 8-25.4 | 500 | 24*180 |
DRC-2000 | φ508-φ2020 | 30 | 1200-2000 | 8-25.4 | 550 | 24*180 |
DRC-2400 | φ508-φ2400 | 30 | 1200-2000 | 8-25.4 | 600 | 24*200 |
DRC-3000 | φ508-φ3000 | 30 | 1200-2000 | 8-25.4 | 700 | 24*200 |
▶ Spiral Weld Pipe Mill Application Scope:
▶ Why choose us?
Since its establishment in 2002, Condor Heavy Industries has successfully operated its equipment in more than 20 countries and has dealers involved.According to Chinese export customs data, Dorco's related equipment ranks among the top ten in the industry, which means reliable quality and price.
With 21 years of manufacturing and export experience, Dorco supports the design and customization of equipment on demand, provides equipment configuration details and parameter guidance, and guarantees subsequent production quality and equipment adjustment. Here, you can get professional advice for your needs.
▶ Customer factory inspection communication:
▶ Our Clients Say
▶ DORCO Factory Common inquiry
Q:What information we need customers to provide?
A:Dorco has R&D Center to focus on the study for new product. We can design and make the change as customer’s requirements. We keep an opened mind to service our customers.
Q:What’s your quality control system?
A:We operate ISO9001 Quality Management System. We control our products quality by our workshop processes: Materials incoming inspection, Machining process control, finished testing and Inspection before packing. Each step has inspector and the testing results will be recorded for checking.
Q:What kind of payment terms do you accept?
A:We prefer T/T through bank. 30% when order is confirmed and 70% before shipment. L/C is also acceptable for amount over 200,000USD.
Q:What is your warranty policy?
A:All our products are warranted for one full year from date of delivery against defects in materials and workmanship.This warranty does not cover parts that are worn out through the course of normal operation